Construction of “Durres-Morine”,Projekti “Kalimash-Rexhepaj,Loti Nr 8”

Place:

Kukes

Client:

General Directorate of Roads

Role in Project:

J/V Copri Construction & Alb BuildingSh.p.k

}

Period:

March 2008/ December 2010

i

Description:

Earth work            1,796,909.78 m³
Steel works           11,228.98 Ton
Sub base               82,431.54 m3
Asphalt work          353,646.00 Ton
Bridges 4 Bridges (880mTotal)
Concrete Work       40.000m3

Value

53,039,872.163 USD